Project info

  • Business and Industrial
  • Des Moines, Iowa

  • Heavy Equipment Facility

  • Fusion AE

  • Design Build

Project overview

As Titan Machinery continued to grow, their Des Moines location needed more space to support the volume and pace of their operations. With constant equipment movement, deliveries, and service work happening daily, the expansion had to improve capacity without slowing them down.

The project included the construction of two new buildings: an addition to support equipment service and a separate wash bay and parts facility. These additions were designed to improve workflow, increase efficiency, and better support their team in keeping equipment moving.

One of the biggest challenges was completing the work on an extremely active site. Their operation never slowed down, so the project required careful coordination to keep trucks moving, deliveries on schedule, and service work uninterrupted throughout construction.

The result is a more functional, better organized facility that supports the way Titan operates every day and gives them the space they need to continue growing.